Every North American city

Behind the meter. Pre-selected buildings. Deployed in months, not years.

Mitrex NODE puts tens of megawatts of AI compute behind the meter across multiple cities in Canada and the US, in buildings we have already screened for spare capacity.

Facility load includes cooling and power overhead. Compute is about 83% of facility load (for example 250 kW of 300 kW, or 830 kW of 1 MW).

Two Mitrex NODE pods installed in a parking garage: a power pod and a compute pod
Power pod + compute pod · Full assembly
Behind the meter
  • Existing 600 V connection, no new utility service
  • No interconnection queue
  • 300 kW to 1 MW of facility load per Mitrex NODE
Pre-selected sites
  • Screened for spare capacity before you sign
  • No campus to build
  • You own and operate the compute; Mitrex builds, sites and integrates
Roll-in deployment
  • Factory-built pods, crane-free, energize on arrival
  • 250–830 kW of compute · direct liquid cooled
  • 2-hour fire-rated · 2N power path
  • Designed to be certified as equipment, not constructed space
Canada + US
  • Built in Toronto
  • Shipped anywhere in Canada & the US
The bigger story · A distributed inference cloud

Hyperscale campuses are running into grid queues, permitting and growing public pushback. Inference doesn't need a campus. It needs to sit close to the people, vehicles and robots that call it. Mitrex NODE turns the spare capacity already inside city buildings into a distributed inference cloud.

That is the layer the physical-intelligence economy runs on. Every Mitrex NODE puts compute where the agents are, and as their density rises, so does what the whole fleet can do together.

Why Mitrex NODE

The power is already there. So is the building.

Every city in North America is full of buildings sitting behind an existing connection with spare capacity. We screen buildings in your target cities for spare capacity, floor load and fibre. ~400 already screened in Toronto. Mitrex NODE puts your compute there, behind the meter, from 300 kW to 1 MW per site, inside the city where inference is used, with no grid upgrade and no new occupancy classification.

01 · Behind the meter

No new utility service. Ever.

Each Mitrex NODE connects at 600 V behind the building's existing meter and uses spare capacity the building already pays for: up to 80% of what's there, with a 20% buffer. No substation, no transmission study, no interconnection queue.

02 · Pre-selected buildings

The sites are screened before you sign.

We screen buildings in your target cities for spare capacity, floor load and fibre. ~400 already screened in Toronto. You tell us the cities and the megawatts; we hand back a list of qualified addresses with a host ready to lease the space.

03 · Fast to deploy

Built in the factory, rolled into the garage.

Pods leave Toronto finished and tested, skate down a standard ramp with no crane, and connect to power, fibre and the heat loop. Because the site and the connection already exist, deployment is measured in months, not the years a new campus takes.

Inside the compute pod

Four racks, a PDU and 2N A/B CDUs in a van-height box.

250–415 kW of compute across 4 racks. Platform and fabric are per customer specification. Cold-plate direct liquid cooling with 2N redundant CDUs (A/B) per pod and N+1 hot-swappable pumps. A CDU or pump failure causes no loss of capacity.

Drag the pod to rotate it. Hover or tap a part to see what it does.
Drag to rotate
Ownership & resilience

You own it. It's resilient.

The operator owns racks, network, workload and customers. 2N, Tier III-equivalent power, full-load UPS with 15-minute ride-through (the only battery in the system) and a standby generator outside the garage. Scale from one Mitrex NODE to a city-wide fleet, from 300 kW to 1 MW per site.

Coverage

Available in every city across Canada and the USA. ~400 potential buildings in Toronto alone.

Building with ≥ 300 kW spare (illustrative)
Mitrex NODE in an illustrative pilot cluster
+ any city you name
TorontoIllustrative layout · pilot cluster of 4 Mitrex NODEs · 300 kW to 1 MW each
Same connection, no upgrade. Each Mitrex NODE sits behind an existing sub-1 MW connection and uses spare capacity the building already pays for.
Near the users and the agents. Inference lands inside the city, on fibre already in the building, next to the people, vehicles and robots that call it, not hours away.
Grows one site at a time. From one Mitrex NODE to a fleet across every city you operate in, from 300 kW to 1 MW per site, as your allocation arrives.
Why distributed

The next leg of AI runs in the city, not on a campus.

Mitrex builds the physical layer a distributed inference cloud needs: the buildings, the power and the pods. It is the part of the AI build-out most people are still not looking at.

01 · Campuses are hitting a wall

Queues, permits and pushback.

New data-centre campuses now wait years for interconnection and meet growing resistance from regulators, communities and corporate tenants. The spare capacity already inside city buildings carries none of that.

02 · Inference wants to be local

Training can live in the desert. Inference can't.

Inference serves people, vehicles and robots in real time. It belongs on fibre that is already in the building they are standing next to, not hundreds of kilometres away.

03 · Density compounds

More Mitrex NODEs, more capable fleet.

Every Mitrex NODE brings compute closer to more physical agents. As their density rises, the fleet as a whole becomes more capable: a swarm, not a server farm.

Models

Two models. One pod format. One certification story.

Mitrex NODE

300 kW

3 pods
Facility load300 kW to 500 kW
Compute250 kW to 415 kW
Pods1 power · 1 compute · 1 plant pod
UPSFull load · 15 min
CommissioningSingle stage
Ontario rate classClass B (typical)
Datasheet (PDF)
Mitrex NODE

1 MW

5 pods
Facility load600 kW to 1.0 MW
Compute500 kW to 830 kW
Pods2 power · 2 compute · 1 plant pod
UPSFull load · 15 min
CommissioningStaged, ~500 kW pairs
Ontario rate classClass A / ICI eligible*
Datasheet (PDF)

Both models share the 2.0 × 2.0 × 5.0 m van-height pod, the 2-hour fire-rated enclosure and DLC cooling. *Ontario only. Class A is an Ontario electricity rate class for large consumers and does not apply to sites in the US or other provinces. Eligibility depends on metering and average monthly peak demand; confirm with the local distribution company.

Assembled
Drag to rotate
Assembled Exploded
How it's built

A 2-hour fire-rated appliance, not a room.

Every pod is the same assembly: a welded ASTM A500 steel frame coated in intumescent paint, fixed MgO-board top and bottom panels, and 6-inch fire-rated mineral-wool side panels that pull off for full-bay service access. It is designed to be certified as equipment, with no new occupancy and no constructed space.

  • Rolls in on skates. Down a standard garage ramp, no crane; sits on the existing slab at ~150 psf.
  • Serviced from the outside. Six captive fasteners per panel; intumescent seals and silicone foam gaskets at every joint.
  • The plant pod stays outside. It houses the standby generator and chiller at grade (plus fuel on the 1 MW model); heat goes back to the building's hot-water loop.
  • Listing in progress. Enclosure assembly being certified as a single electrical unit.
How it deploys

From letter of intent to energized, in four steps.

01

Non-binding LOI

No capex, no exclusivity. It tells us the cities, the target MW and your spec so the work that follows is real.

02

Pre-screened sites & price

We screen buildings in your target cities for spare capacity, floor load and fibre. ~400 already screened in Toronto. We match your cities and MW to qualified addresses and return a priced package per site against your BOM.

03

Factory build & roll-in

Pods are built and tested in Toronto, then skated into the garage and connected to power, fibre and the heat loop by a construction partner.

04

Energize & scale

Your team takes over the racks. Add sites, from 300 kW to 1 MW each, as allocation arrives. The cluster grows without a new campus, and every Mitrex NODE you add makes the fleet more capable.

Who does what

Three seats. Clear lines.

It works like a rooftop cell site. The operator owns the equipment, the building owner rents the space, and Mitrex makes the two fit by manufacturing the pods, screening the sites and integrating the plant. A general contractor executes the install; it is the link between the seats, not a fourth owner.

Racks, network, workload, customers. Sets the spec, the cities and the MW schedule. Signs the LOI; owns the Mitrex NODEs at scale.

The building owner leases the bays and the spare capacity. No capex, no operating risk, optional waste heat back to the building.

Builds the pods in Toronto, screens and secures host buildings, integrates the electrical partner's power and cooling, and holds the Mitrex NODE architecture.

A general contractor places the pods and connects them to the building and the grid.

A Mitrex NODE finished as a dark wall panel with a green status light in a residential parking level
For building owners

Own a parking level with spare electrical capacity?

Think of it like a rooftop cell site. You lease two stalls and the spare capacity; the operator owns and runs the equipment. No capex and no operating risk on your side. Your garage becomes part of the city's inference cloud, and there can be heat back to the building and a Mitrex solar façade to add capacity.

Lease income on space you're not using
No capex, no operations
Optional waste-heat recovery and BIPV
Downloads

Take the numbers to your engineers.

First page of the Mitrex NODE datasheet
Downloads

Mitrex NODE datasheet

Compute, power, cooling, enclosure and compliance for both models in one document. Enter your details and it's yours.

By submitting, you agree that Mitrex may email you about Mitrex NODE and you accept our Privacy Policy. You can unsubscribe at any time.
Thank you.The Mitrex NODE team will send you the datasheet shortly.
Built by Mitrex

A manufacturer, not a slide deck.

Mitrex has manufactured building-integrated solar façades in Toronto for over a decade. The same factory, quality system and installation partners now build the pods. Façades that make power and pods that put inference where the agents are: the physical layer of the intelligence economy, built in one plant.

Visit mitrex.com
Largest BIPV manufacturer in North America

Five production lines at 41 Racine Road, Toronto.

ISO 9001 · 10002 · 10004

Quality, complaints and customer-satisfaction management, certified by IG Cert. The only BIPV company holding all three.

Guinness World Record

Largest solar panel mural: The SunRise, Edmonton. A second record is underway in Dubai.

North America's largest BIPV installation

Garron Health Sciences Complex (SAMIH), University of Toronto Scarborough: 632 kW of solar, built with EllisDon and Diamond Schmitt.

Privacy Policy

Mitrex NODE · Last updated: October 22, 2026

This policy explains how Mitrex (“Mitrex”, “we”, “us”) handles personal information collected through the Mitrex NODE page (the “Site”). It follows the approach of the Mitrex Privacy Notice, which continues to apply to our other websites and services. By using the Site or submitting a form, you agree to this policy.

What counts as personal information

Any information that identifies you as an individual, such as your name, email address, phone number, company and role, or IP address.

What we collect

How we use it

Your consent

When you submit the datasheet form, you agree that Mitrex may contact you by email about Mitrex NODE, including follow-up on your request. You can withdraw your consent at any time by using the unsubscribe link in our emails or by contacting us using the details below. If withdrawing consent limits what we can provide, we will tell you so you can make an informed choice.

Who we share it with

We do not sell your personal information. We share it only as needed with service providers that host the Site, process form submissions, store contact records or help us send email, and they may use it only to provide those services to us. We may also share it where the law requires, to protect our rights, or if our business or assets are sold or merged. We limit what we share to what is necessary for the purpose.

Where your information is stored

Mitrex is based in Canada. Your information may be processed and stored in Canada and in other countries, including the United States, where privacy laws may differ from those in your country.

Security and retention

We use physical, electronic and procedural safeguards to protect personal information against loss, misuse and unauthorized access or disclosure, and we limit access to the people and providers who need it. No transmission over the internet is completely secure, so we cannot guarantee absolute security. We keep personal information only as long as needed for the purposes described here, or longer where the law requires. We may keep anonymized information for statistical purposes.

Your rights

You can ask to see the personal information we hold about you, ask us to correct it, ask us to delete it, or withdraw your consent. Contact us using the details below; we may need to verify your identity first, and we will respond within the time the law requires. If we cannot give you access, we will explain why. If you are not satisfied with our response, you can contact the Office of the Privacy Commissioner of Canada or your local privacy authority.

If you are in the European Union: under the GDPR you also have the right to obtain a copy of your data, have it corrected or erased, restrict or object to its processing, receive it in a portable format, and lodge a complaint with your data protection authority. To use any of these rights, contact us as below.

Children

The Site is not intended for anyone under 16, and we do not knowingly collect personal information from children. If you believe we have, contact us and we will delete it.

Links to other sites

The Site links to other websites, including mitrex.com. We are not responsible for the privacy practices of sites we do not control, so please read their policies before you share information with them.

Changes to this policy

We may update this policy from time to time. When we do, we will change the “Last updated” date above.

Contact us

Mitrex
41 Racine Road
Toronto, Ontario M9W 2Z4
Attention: Privacy Office
Email: info@mitrexnode.com